Muhlenberg Job Corps Heavy Equipment Operator students have installed a walking trail that encircles the water tower on the center’s campus. The 1/3 of a mile crushed gravel track will include exercise stations throughout the trail. The Muhlenberg Wellness Advocates have started a Muhlenberg Athletic Fitness Association in conjunction with the building of the track. The intent is to get Muhlenberg staff and students in step with the Let’s Move Campaign.
Muhlenberg Installs New Walking Trail
Tags: Let's Move Campaign | Muhlenberg Job Corps